Emergency Bridge Repair

In Cocoa Beach, FL a truck carrying an excavator met
a low bridge and created a traffic nightmare. Barnhart
was called in to help. State officials closed the interstate
the night of the urgently needed bridge work. Then, the
first step for the team was to shore up the span with
a gantry system while the damaged section was cut for
dismantling and removal. Next, Barnhart used a PSTe
Goldhofer trailer stacked with pipe stands and topped with
beams to lift and transport the damaged section
to a staging area near the median for dismantling.